Construction Lead-Mechanical

bayt.com

Job Description

Requirements of the Role:

The successful candidate will:

 

  • Actively supports all HSE initiatives on-site and actively promotes a strong HSE culture.
  • Ensure the Projects entrusted with are executed / Constructed in a safe and timely manner within the approved budget
  • Ensure that an excellent Construction service is always rendered to JIGPC with the efficient manner in which Contractors are managed.
  • Ensure adequate and effective communication within and across the project team, internal and external stakeholders
  • Ensure technical and execution risks are identified and managed
  • Establish and maintain relationships with  all JIGPC personnel, including Project Delivery, Operations, Engineering, and Saudi Aramco personnel to achieve success
  • Ensure progress status is transparent and accurately reported out on a periodic basis
  • Attend Weekly Progress Meetings with Contractors and ensure the submittal of Weekly Reports by all Contractors.
  • Ensure that all Issues & Concerns as well as the reasons for the Negative Variance Analysis in Progress as mentioned in Weekly Reports, are actively pursued and that these problems are solved on a continuous basis to ensure continuous work front for Contractor.
  • Attend Daily Toolbox Talks of Contractors on site and set the example to all employees on the promotion of an active HSE culture.
  • WALK THE TALK on all HSE matters.
  • Attend Weekly HSE Walkthroughs with the Contractors on various project sites, actively participate in all HSE initiatives and make safety part of the way of doing our job on site.

Work Scope to be delivered:

  • The job involves the broad knowledge of Mechanical systems including piping, structures and associated construction methodology.
  • Execution and Construction Management of Projects in a brownfield environment to achieve the goals and objectives set by the business.
  • Construction Management skills to manage a diverse group of Engineers, Contractors, Technicians and other stake holders
  • Constructability studies where required to generate innovative ideas of problem solving as well as giving guidance to Contractor.
  • Knowledge of and familiarity with Saudi Aramco Engineering Standards, Procedures, Best Practices and Inspection Procedures (SAES, SAEP, SABP and SAIP) and Materials Systems Specifications (SAMSS)

This position is accountable for the following end results:

 

Reports to the Construction Manager as Construction Lead on assigned projects during Construction and Commissioning phases of the project.  Coordinate with company Engineers and Contractor Engineers. Executes assigned work in accordance with the Project and Construction Execution Plan and applicable Project Procedures and Standards.  Ensures that the work follows applicable HSE, Quality and financial standards and procedures at all times. Ensure that the Work Pack of the Project when it is received from Project Management, is fully complete and that all required information in included in such Work Pack. Ensure, as a minimum, that all material and equipment is available, when Work Pack of Project is received from Project Management and that all required Engineering Drawings are included. Leads a team of direct and indirect reports to deliver projects safely according to the agreed scope, budget and schedule.  Delivers value through the active usage of Constructability to generate alternatives to execute the project and ensure that all aspects regarding craneage, scaffolding, access, etc. have been properly evaluated during the Construction Process. Manages the interfaces between the various parties on the project including Engineering, Contractors, Vendors, Operations, HSE and Quality. Leads the planning and execution of the field work in conjunction with – and under the leadership of – the Construction Management. Ensures that the contractors are progressing within the agreed manhour and cost budgets and in accordance with project schedule.  Reports any deviations and applies agreed corrective actions where required. Provides input to the project controls team for cost and schedule reporting. Ensure that all scope changes are properly raised and recorded to cover manhours, costs and schedule impacts and coordinate on review of change order documents.

>

share :